This is the last week to utilize the Barrhead Regional Aquatic Centre before it closes for annual maintenance.
The facility will be closed from Aug. 31 to Sept. 16 for repairs and upkeep.
During this period, the pool will be fully drained and inaccessible to residents.
The pool is expected to reopen at 2 p.m. on Sept. 17, provided water quality tests are successful once the pool is refilled. Town officials say the reopening date will be confirmed once results are available.











