Construction is underway on the Water Treatment Plant road in the Town of Barrhead.
The town says residents are likely to be getting outside to enjoy the warmer weather, and asks those individuals to utilize walking paths and trails located away from the Water Treatment Plant as the work is done.
Residents are also asked to avoid asking construction staff for passage through the gated and fenced areas around the construction zone.
Questions can be directed to 780-674-2464 or publicworks@barrhead.ca.











